Overview

The qualification has core unit of competency requirements that cover common skills for the construction industry, as well as two specialist fields of work.


The construction industry strongly affirms that training and assessment leading to recognition of skills must be undertaken in a real or very closely simulated workplace environment and this qualification requires all units of competency to be delivered in this context.


Completion of the general induction training program specified by the National Code of Practice for Induction Training for Construction Work (ASCC 2007) is required before entering a construction work site. Achievement of unit CPCCOHS1001A covers this requirement.

Your Career

• This qualification provides a trade outcome in wall and ceiling lining.

Occupational titles may include:

• Wall and ceiling liner.

Entry Requirements

Not applicable/Nill

Admission Requirements

• 18 years old and above at the time of enrolment

• Pre-training review

• LLN test

Other Requirements

For Qualification by RPL the candidate MUST provide the following required documents:

1. 100 points ID

2. Unique Student Identifier – USI number

3. Resume (Relevant Industry)

4. Reference Letter (Relevant Industry)

5. Payslip

6. Worksite Photos & Videos evidence

Units of Competency

To achieve this qualification, the candidate must demonstrate competency in:

  • 26 units of competency:

  • 19 core units

  • 7 elective units.

A maximum of two of the seven required elective units may be substituted by selecting relevant units of competency from any Certificate III or IV construction qualification or qualification in another endorsed Training Package.

Some units in this qualification may have prerequisite requirements, which must be met when packaging the qualification. Users are referred to the list of CPC08 units with prerequisite unit requirements available in this Training Package for this purpose.

Core units 


CPCCCM1012A

Work effectively and sustainably in the construction industry

CPCCCM1013A

Plan and organise work

CPCCCM1014A

Conduct workplace communication

CPCCCM1015A

Carry out measurements and calculations

CPCCCM2001A

Read and interpret plans and specifications

CPCCCM2010B

Work safely at heights

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry


Fixing (hanging) field of work 


CPCCPB3001A

Fix standard plasterboard wall sheets

CPCCPB3002A

Fix standard plasterboard ceiling sheets

CPCCPB3003A

Fix battens

CPCCPB3004A

Fix wet area sheets

CPCCPB3005A

Fix ceiling sheets to external protected areas

CPCCPB3006A

Fix fibre cement board


Finishing (stopping, sanding and cornices) field of work 


CPCCPB3007A

Apply levels of finish standards to planning and inspection of own work

CPCCPB3008A

Mix plastering compounds

CPCCPB3009A

Finish plasterboard joins manually

CPCCPB3010A

Manually sand plaster work

CPCCPB3012A

Cut and fix paper-faced cornices


Elective units 


Commercial wall and ceiling lining field of work 


CPCCCA3014A

Construct bulkheads

CPCCCA3015A

Assemble partitions

CPCCCM2006B

Apply basic levelling procedures

CPCCCM2007B

Use explosive power tools

CPCCWC3001A

Install and finish plasterboard and fibre cement sheeting to curved walls and ceilings

CPCCWC3003A

Install dry wall passive fire-rated systems

CPCCWC3004A

Install suspended ceilings


Plasterboard handling field of work 



General electives 


BSBSMB301

Investigate micro business opportunities

BSBSMB406

Manage small business finances

CPCCCA3001A

Carry out general demolition of minor building structures

CPCCCM2008B

Erect and dismantle restricted height scaffolding

CPCCCM3001C

Operate elevated work platforms

CPCCPB3014A

Install batt insulation products

CPCCPB3015A

Install acoustic and thermal environmental protection systems

CPCCPB3016A

Install and finish columns

CPCCPB3017A

Rectify faults in plaster applications

CPCCPB3018A

Use vacuum and electric sanding equipment to finish plaster work

CPCCPB3019A

Inspect equipment for serviceability

CPCCPB3020A

Match, mitre and install cast ornamental cornices

CPCCPB3021A

Install and fix residential acoustic plaster products

CPCCPB3022A

Use mechanical jointing equipment to finish joints

CPCCPB3026B

Erect and maintain trestle and plank systems

CPCCPB3027A

Install ceiling insulation

CPCCSP3003A

Apply trowelled texture coat finishes

CPCCSP3005A

Install pre-cast decorative mouldings

CPCCWC2001A

Complete penetrations and flashings

CPCCWC3002A

Install and finish plasterboard and fibre cement sheeting to arches


Pathways

Not applicable

Duration

Please contact us for this info.

Study Mode: * Class Room (Please Contact First For Availability ) * Blended * Assessment ( RPL & Gap Training)

FAQ

CONTACT

APPLY NOW